-1.jpg&w=3840&q=75)
Marine
Aft Cover Alterations & New Side Clears
Kirribilli, NSW
Completed August 2026Materials: Regalight sheet clear, webbing strapsCockpit Enclosure Repairs · Weather Cover Repairs · Cockpit Enclosures · Flybridge Enclosures
Alterations to an aft cover and flybridge cover, plus new Regalight side clears and refitted mesh sides.
The brief
The customer requested alterations to the aft cover and flybridge cover, new side clears in Regalight sheet, and refitting of the existing mesh sides.
What we did
We modified the aft and flybridge covers as discussed, made and fitted two new Regalight side clears on the outside using the existing track and stayput fittings, refitted the mesh sides inside with track and press studs, and replaced two bimini webbing straps.
Gallery
-1.jpg&w=3840&q=100)
-1.jpg&w=3840&q=100)
-1.jpg&w=3840&q=100)
-1.jpg&w=3840&q=100)
-1.jpg&w=3840&q=100)
-1.jpg&w=3840&q=100)

